The Lance Projects are located on the North-East flank of the Powder River Basin in Wyoming, USA. The original NuBeth Joint Venture between Nuclear Dynamics Inc, Bethlehem Steel Corporation and later Pacific Power and Hydro (NuBeth JV), discovered thirteen substantial zones of uranium mineralization associated with an extensive system of roll fronts confirmed by drilling between 1970 and 1979. As part of this exploration program, the NuBeth JV drilled more than 5,000 exploration and development holes, totaling in excess of 997,375 yards (912,000 meters). A proprietary database of the historic drilling and pilot plant data was acquired by Peninsula in 2007, defining a then relatively unknown uranium district of which Peninsula is now the dominant mineral rights holder.

The Company has explored only part of this area since 2007 and has already delineated over 53.7mlbs of U3O8 JORC Code (2012) compliant resource.

The Lance Projects have 190 line miles (305 kilometers) of identified roll fronts and an exploration target of 104-163mlbs U3O8, which is in addition to the JORC Code (2012) compliant resource. These roll fronts stretch over 31 miles (50 kilometers) north-south and are open to the north, south and west.

Unlike most in-situ recovery (ISR) projects, Peninsula’s mineral resources are located on contiguous landholdings that we control. This allows Peninsula to develop the Lance Projects in a cost-effective manner, without having to incur infrastructure and facility development costs that would otherwise be required if our landholdings were not contiguous.

Commencement of Production

In December 2015 Peninsula received the United States Nuclear Regulatory Commission’s (NRC) authorisation to begin in-situ uranium recovery operations from the Ross Permit Area at the Lance Projects in Wyoming, USA (Lance Projects).

The NRC preoperational inspections were held during November 2015, and confirmed that the constructed plant and associated site systems up to the ion exchange columns, including wellfields, indicated that the plant is physically capable of conducting in-situ uranium recovery operations. The NRC also confirmed that written operating procedures and approved radiation safety and environmental monitoring programs were in place, and verified that preoperational testing was complete.

Current Operations

20151016_wyoming_uranium_deposits_test

Figure 1: Lance Projects Location, Wyoming, USA

Since the initial injection of O2 and CO2 at the first header house unit on 2 December 2015, production well flow-rates are meeting expectations and substantially confirming the permeability of the ore body, a key risk factor in ISR operations. The Central Processing Plant (CPP) and well field systems are operating as expected.

Due to the 2016 uranium price pull back, the Company reviewed its operating plan during Q3 CY2016 and implemented an interim operating strategy in Q4 2016 until uranium prices improve. Current production is focused on meeting its Lance Projects sourced delivery commitments under existing term contracts. A summary of quarterly production up to March 2017 is below.

Lance Projects Quarterly Production

Production to March 2017 has been primarily from header houses 1,2 and 3. Each header house experiences slightly different rates of ramp-up with header houses 3 and 4 taking longer to ramp-up than originally projected. Grade performance through Mine Unit 1 (comprising header houses 1 to 4) has been lower than forecast and inclement weather through the Wyoming winter hampered ongoing wellfield maintenance, with staff often unable to access the wellfield due to the extreme cold. Inclement weather also contributed to delays in the completion of construction and commissioning of header houses 5, 6 and 7 however as at May 2017 uranium is being produced from header houses 5 and 6. Header house 7 remains in re-circulation however is due to be turned to the CPP during May 2017.

While grades have at times tracked below forecast in Mine Unit 1, the Company has seen a solid increase in the grade performance of Mine Unit 2 during initial ramp up in April 2017.

Alkaline leach chemistry continues to be refined as part of ongoing ramp up activities to determine the appropriate mix to optimize the rate of uranium extraction.

Average flowrates from extraction wells within Mine Unit 2 were below forecast during the March 2017 quarter, however the Company is addressing these issues through the implementation of a range of action items including the installation of additional filtration on the injection lines, more aggressive well swabbing and other targeted maintenance activities. It is noted that flow rates in header house 5 and 6 have responded positively during April 2017 to this work.

For the 2017 calendar year the Company expects production from the Lance Projects to be a minimum of 150,000lbs U3O8 to meet its committed deliveries of uranium sourced from the Lance Projects.

At present the spot market remains weak and the Company is operating on an alternate operating plan tailored to existing term contracts. The Company will however continue with the roll out of additional header houses, as construction of header houses 8 thru 10 will allow flowrates across all production wells to be optimized and balancing of average uranium head-grades across header houses. Lower operating costs combined with existing high value term contracts should see Peninsula move to sustainable cash generation in the first half of the 2017 calendar year, a significant achievement in the current market.

At full capacity the Lance Projects development plan comprises a three stage ramp up:

  • Stage 1 – production rate of between 500,000 and 700,000 lbs U3O8 per annum;
  • Stage 2 – production rate of up to 1,200,000 lbs U3O8 per annum; and
  • Stage 3 – production rate of up to 2,300,000 lbs U3O8 per annum.

Sales and Marketing

The Company delivered 100,000lbs U3O8 in January 2017 (sourced from the Lance Projects) and a further 150,000lbs U3O8 (purchased on market) was delivered in March 2017. Revenue from these deliveries was US$13.5 million, resulting in an average realized cash price of US$54/lb U3O8 during the quarter which is more than twice the average spot price for the quarter (UxC average Spot price for the quarter was US$23.96/lb U3O8). Up to 150,000lbs U3O8 remains to be delivered in the 2017 calendar year, with the next delivery currently scheduled for August 2017.

More importantly, the Company recorded positive cash flow from the production, purchase and sale of U3O8 in the March Quarter.

Uranium Sale Agreements

Peninsula currently has up to 7.7 million pounds of U3O8 remaining under contract for delivery to major utilities located in the United States and Europe. Projected revenue remaining under these existing long term contracts is up to US$420 million. These contracts provide a substantial earnings stream to the Company whilst allowing it to retain significant quantities of planned U3O8 production for future contracting during periods of anticipated improved uranium prices.

The weighted average delivery price for these five contracts over the next 10 years is US$55/lb U3O8.

Peninsula continues to negotiate additional product sales contracts with various counter parties and plans to enter into term contracts for an additional 1.0 to 2.0 million pounds of uranium concentrate for delivery over the next five years.

Peninsula has established a dedicated sales and marketing function in order to market and sell the uranium that we expect to produce from the Lance Projects directly to nuclear power generating utilities under long-term uranium concentrate sale and purchase agreements.

By having its own internal sales and marketing team, Peninsula is able to deal directly with the procurement functions within nuclear power generating utilities without the need for intermediaries. Not only does this reduce overall sales and marketing costs, it also enables Peninsula’s executive management to meet face to face with their counterparts from the utilities. Over the past four years, the Company’s marketing efforts have focused on building market knowledge of Peninsula and its plans with North American and European utilities, and positioning Peninsula to participate in the nuclear fuel procurement processes of these utilities prior to production commencing at our projects.

Permitting Status – Fully Permitted

The Company has in place all material licenses and permits required to construct and operate the Lance Projects and to sell the U3O8 extracted therefrom.

The following key permits and licenses have been granted:

  • the Underground Injection Control Permit (Class I) issued by the Wyoming Department of Environmental Quality on April 13, 2011;
  • the Air Quality Permit issued by the Wyoming Department of Environmental Quality on September 13, 2011;
  • the Permit to Mine issued by the Wyoming Department of Environmental Quality on November 16, 2012;
  • the Safety Evaluation Report issued by the NRC on February 28, 2013;
  • the Aquifer Exemption issued by the United States Environmental Protection Agency on May 15, 2013;
  • the final Supplemental Environmental Impact Statement issued by the NRC on February 28, 2014;
  • the Source Material and By-product License issued by the NRC on April 24, 2014, allowing the Lance Projects to process up to 3.0 million pounds per annum of U3O8; and
  • the Pre-Operational Inspection approval issued by the NRC on November 30, 2015 authorizing the commencement of production operations.

JORC Code-Compliant Resource

On January 24, 2013 Strata announced a further upgrade to the JORC-compliant Resource Estimate for the Lance Projects. This upgrade was achieved by the completion of an additional 676 rotary mud drill holes completed in the seven months subsequent to the March 2012 resource estimate.

The resource, now totaling 53.7Mlbs, has been calculated by applying a combined constraint of a GT of 0.2 contour and 200ppm eU3O8. These cut offs are considered to be appropriate for both calculating and reporting of ISR resources at the Lance Projects.

The measured, indicated and inferred resources are located in host sandstones that have demonstrated positive uranium recovery from test-work. Geological modelling of the extensive down-hole geophysical data has accurately defined the impermeable shale and mudstone horizons that form the confining horizons to the mineralized sandstones.

Table 1: Lance Projects, Wyoming USA – Classified Resource Summary (U3O8)

TotalTonnes Ore
(M)
U3O8 kg
(M)
U3O8 lbs
(M)
Grade
(ppm U3O8)
Measured4.12.14.5495
Indicated11.65.712.7497
Inferred35.516.636.5467
Total51.224.453.7476
(JORC resource is reported above a lower grade cut-off of 200ppm and a GT of 0.2.)

Table 2: Lance Projects Classified Resource by Resource Unit (U3O8)
RossTonnesGrade
(ppm U3O8)
U3O8 lbsAverage
Thickness
(ft)
Average GT
Measured2,824,5715003,112,02910.00.50
Indicated5,823,1435316,818,8228.40.45
Inferred1,145,3774971,253,76210.50.52
Total9,793,09151811,184,6129.00.47
KendrickTonnesGrade
(ppm U3O8)
U3O8 lbsAverage
Thickness
(ft)
Average GT
Measured682,078506761,0869.30.47
Indicated3,706,8084964,056,8669.40.47
Inferred23,834,08247224,799,06810.00.47
Total28,222,96847629,617,0209.90.47
BarberTonnesGrade
(ppm U3O8)
U3O8 lbsAverage
Thickness
(ft)
Average GT
Measured636,302461647,0459.50.44
Indicated2,002,1844001,765,2639.80.39
Inferred10,498,57445210,460,2849.70.44
Total13,137,06044412,872,5929.50.42
TotalTonnesGrade
(ppm U3O8)
U3O8 lbsAverage
Thickness
(ft)
Average GT
Measured4,142,9514954,520,1599.80.49
Indicated11,532,13549712,640,9519.00.45
Inferred35,478,03346736,513,1149.790.46
Total51,153,11947653,674,2249.70.46

*Joint Ore Reserves Committee, Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves

 

Exploration Target

The Lance Projects covers an area of over 46 mi2 (120 km²) within which there is a combined total of 190 line miles (305 kilometers) of known stacked roll fronts. Of this total, only a small percentage has been explored, with over 90% of the drilling concentrated within the more advanced Ross, Kendrick and Barber areas. Based on the historic conversion rate from roll front length to a drill-defined resource, the exploration target of the Lance Project, which is in addition to the JORC-compliant resource, is assessed at between 104 and 163 Mlbs U3O8. The exploration target is based on an anticipated grade range of 426ppm to 530ppm U3O8. This grade range approximates the minimum and maximum modelled grades respectively.

Table 3: Lance Projects Exploration Target

Exploration AreasTonnes
(M)
Grade
(ppm U3O8)
eU3O8
RangeFromToFromToFromTo
Total168.9185.9426530157.7217
(Totals include existing JORC Resource)

Please note that in accordance with Clause 17 of the JORC (2012) Code, the potential quantity and grade of the ”Exploration Target” must be considered conceptual in nature as there has been insufficient exploration to define a Mineral Resource and it is uncertain if further exploration will result in the determination of a Mineral Resource.